Hoff Construction provided complete project development, design, and construction services for the new Crop Production Services Facility. The building will be used for the bulk storage and supply/delivery of chemical products for the region’s agricultural community.

Crop Production Services, Inc. hired hoff construction to design and build a facility on a previously-undeveloped, twelve-acre site. Construction of the facility included site grading with import of nearly 10,000 tons of structural fill, site drainage improvements, soft surface paving and landscaping, construction of a 206’ x 61‘ shop building with restroom facilities, a meeting/break room and an exterior loading dock. The project also includes a 45’ x 70‘ concrete blending plant with an adjacent 40’ x 100’ structural concrete loading pad capable of spill containment of a minimum of 1,500 gallons of liquid product.

Additionally, Hoff construction built the adjacent structural foundation pad used for a one million gallon liquid storage tank (tank by others) with a structural concrete loading pad also capable of spill containment of a minimum of 1500 gallons of liquid product.